- 积分
- 2058
- 回帖
- 0
- 西莫币
-
- 贡献
-
- 威望
-
- 存款
-
- 阅读权限
- 35
- 最后登录
- 1970-1-1
该用户从未签到
|
在Simplorer Online Help 513、514页发现,好像maxwell与simplorer9联合仿真可以中断与继续,按照说明进行了设置但没实现,求大神帮忙!
help的说明如下:
Continuing a Cosimulation with Maxwell(Simplorer Online Help 513、514)
After a successful simulation, either to completion or clean-stopped, you can continue the simulation from the current end time.
To enable this possibility:
You must first have saved a Simulation State (KRN) file at the end of simulation.
You must load the saved KRN file at the beginning of the continuing simulation.
Note:To specify the saving and loading of Simulation State (KRN) files, see Design Settings.
You must specify an end time greater than the current end time. To reset the end time, double click on the analysis setup in the project window.
Then, simply start analysis. Simulation can be extended this way as many times as desired.
我的操作如下:
1、右击工程文件下的design,打开Design Settings,勾选save at end of simulation和load at Start of simulation,如下图
2、然后进行正常仿真,仿真到一定时间就点击Abort中断,然后保存maxwell13与simplorer9.0文件,关闭软件;
3、重新开启软件打开工程文件,进行仿真。
但是结果还是仿真从0秒开始,于是将第二部换做点击clean stop中断,再重来,仿真还是从0秒开始,其实发现软件没有保存一个后缀为KRN的文件,所以对结果不感到意外。所以请教大神 maxwell13与simplorer9.0联合仿真,能不能中断后再继续,如果能,该怎样设置与操作? |
本帖子中包含更多资源
您需要 登录 才可以下载或查看,没有账号?立即注册
×
|